21-04-2008, 03:27 AM #1
Q: Piping installation for Split Types
please give me some data of piping installation if the required length of the pipe is exceed.
for example; the required piping length is 100M maximum, and the actual length of the condensing unit to the evaporator is 120M in the installation site.
do i need to change the required pipe diameter for suction and discharge? please give me some data or charts of piping installation.