    hi all, i`m a transport refrigeration engineer/installer. just resigned from being a manager of a workshop, DUE TO THIS REASON AND OTHERS... i work in a team and management in there infinate wisdom, decide to cut hours for installations. it was suggested by production manager NOT TO LEAK TEST WITH OFN AND A QUICK VAC... on average the vac times ranges from 6 hours to overnight dependant on moisture e.t.c. the job in question recommended by manuf. is 250psi of ofn and 8 hours vac.
    please let me know your views on cutting hours for PROFIT..



  2. #2
    Join Date
    Feb 2004
    Location
    USA
    Posts
    132
    Rep Power
    0

    Re: does cutting hours cut quality

    I dont see where either one really uses up man hours. Ill put equipment on the pump or leak test overnite. No need to be there while this is going on. Unless you sit and watch the vp I dont see where its saving anything. Pay me now or pay me later, theyll get the picture once thier warranty calls go thru the roof.

  3. #3
    fzr1000's Avatar
    fzr1000 Guest

    Re: does cutting hours cut quality

    the thing is they do`nt understand anything about refrigeration. all there interested in is the vehicle going out the door. when i was visiting friends at the site in question i`ve seen fridges not finished, the reply you get is oh someone can finish it at the customers?????????????? does not give a good any values to the customers quality...

  4. #4
    Join Date
    Jan 2003
    Location
    East Anglia
    Posts
    1,160
    Rep Power
    25

    Re: does cutting hours cut quality

    Hi FRZ1000,

    When it comes to vacing out its the quality thats important not the size.
    Just pulling 30" vac over 8 hours doesn't mean jack, really you should have a micron gauge on the system as well. In the old days you would put the gauge on the furthest point from the vac pump (Used to be reciever on old single temp units). If you come from an MTK backround then you will probably know Reeferjon & MRW so they would be able to tell you the Micron level you should get to. Unfortunatly its been MANY YEARS since i done my last course with Colin Lacey & cant remember.

    Strength/Pressure testing is a must, but on the other hand MTK & Carrier are in a major battle for customers (One i thing MTK are loosing at the moment) and are oing everything possible to become more competative.

    At the end of the day, Take pride on your'e work (I am sure you do anyway) and do the job properly, remember if you try to cut time & miss something think how much it will cost to rectify and it will always come back to you.

    Where in the UK are you from to give us a clue which depot you are from

    Regards

    Raymond
    Last edited by Latte; 29-04-2004 at 08:20 PM.

  5. #5
    Join Date
    Nov 2001
    Location
    Shropshire
    Age
    59
    Posts
    260
    Rep Power
    23

    Re: does cutting hours cut quality

    1500mic 1st then 500mic 2nd (broke with OFN).

  6. #6
    Join Date
    Jan 2003
    Location
    East Anglia
    Posts
    1,160
    Rep Power
    25

    Re: does cutting hours cut quality

    Thanks Jon,
    Does anyone out there still use micon gauges or am i still living outside the real world.

    Regards

    Raymond

  7. #7
    Join Date
    Nov 2001
    Location
    Shropshire
    Age
    59
    Posts
    260
    Rep Power
    23

    Re: does cutting hours cut quality

    LOL depends on the managers buget or how lound you moan you could get either Mic or Tor.

  8. #8
    Join Date
    Oct 2002
    Location
    Hampshire
    Posts
    156
    Rep Power
    22

    Re: does cutting hours cut quality

    Hi all, havn't been around for a bit, the hot is here and long days are a definate...

    Micron, Torr guages, imo they really are a must, just using manifold guages for vac indication is a bit pants i feel, the better vac we pull the better our lovely systems will last.

    hopefully.

Similar Threads

  1. Replies: 2
    Last Post: 01-01-2011, 03:57 AM
  2. advice needed on overhaul hours
    By stewartreith in forum Industrial Compressors
    Replies: 1
    Last Post: 15-05-2006, 08:59 PM
  3. RE: Freezer cycles from -20 to -11 once every 24 hours
    By olibubble in forum Trouble Shooting
    Replies: 9
    Last Post: 11-05-2006, 09:36 PM
  4. Good quality training
    By Steve in forum Training
    Replies: 0
    Last Post: 09-07-2001, 06:21 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •