01-06-2006, 05:57 PM
Hi,
Doe's anyone know a calculation for increasing gas quanity when pipe work is lenghtened, The pipes are 1/4 & 1/2" & were extended by 2.5 metres, The gas is 407c.
Thanks Dave.:confused: