Tyson
22-07-2010, 09:33 AM
Has anyone had experience of Mitsubishi Electric replacement systems reusing the existing R22 pipework?
Grizzly
22-07-2010, 07:34 PM
Yeah.
The work well.
Saving a lot of hassle especially when the pipework runs through the fabric of the building.
Making it,s replacement Ni on impossible!
Other companies do similar I believe?
Grizzly
Powered by vBulletin® Version 4.2.1 Copyright © 2024 vBulletin Solutions, Inc. All rights reserved.