We are installing a new Air Handling Unit, and chiller pipeline distance is nearly 50 mtr. The chilled water unit is in 6th floor and the AHU is in ground floor. We are using two chilled water circulation pump max. head 38 mtr. & volumetric flow rate at that head is 20 m3/hr.
My question is what are the probable problems with this scenario, if we run the system.
AHU capacity is 9000 cfm, and chilled water temp required 6.5 to 12 deg. C, no flow rate is mentioned.