09-03-2010, 04:21 PM #1
P trap correct installation
Hi,
Im currently installing some large DX comms room units.
I have a riser lift of about 8m to 10m, and have been specified to install p traps and oil traps for the remote condenser pipe work.
Can any one specify the correct way of performing this, as several ways have been brought to my attention.
Basically i have a 8 to 10m riser and i would like to know whether i put traps on both discharge and liquid? p traps at the bottom and oil traps half way up??
people are confusing me on the correct way?????
would appreciate some ones advice??
thank you
Similar Threads
-
The correct way to write CO2.
By nic_f in forum CO2Replies: 5Last Post: 09-02-2009, 07:27 PM -
Installation of NRVS check valves
By Josip in forum NH3Replies: 10Last Post: 02-12-2008, 01:33 PM -
Q: Piping installation for Split Types
By brianubaldo in forum RefrigerantsReplies: 11Last Post: 30-04-2008, 02:23 PM -
how can i correct the dilution of the oil lubricant when i use hydrocarbons?
By mebluna in forum RefrigerantsReplies: 5Last Post: 11-07-2007, 03:06 AM -
Evaporative condenserīs liquid drain trap
By Volnei in forum IndustrialReplies: 7Last Post: 24-10-2003, 02:46 AM