Results 1 to 12 of 12
Thread: Copper pipes pressure test
Threaded View
-
12-10-2008, 01:42 PM #1
Copper pipes pressure test
Hi guys.
I'm going to start a pressure test for 30 hp VRV-WII piping sysem.
DAIKIN said don't pressurize more than 40.
Our ambient temperature is variable and we afraid from the increasing of the pressure (causing damages in the equipments) due to temp increasing.
Can I decrease the test pressure to 35 bar to prevent the damages. Is 35 enough?
Thanks.
Similar Threads
-
Leak Testing?
By Thana in forum Trouble ShootingReplies: 36Last Post: 31-08-2010, 02:57 PM -
Compressor loading, cooling, and range of operation.
By Air duster in forum FundamentalsReplies: 10Last Post: 02-04-2008, 08:39 AM -
Benji
By benji in forum Trouble ShootingReplies: 29Last Post: 30-01-2008, 01:25 PM -
Building a wine cabinet
By Rory in forum Technical DiscussionsReplies: 38Last Post: 13-07-2004, 08:28 PM