Results 1 to 2 of 2
Threaded View
-
04-06-2008, 01:24 PM #1
How to commit ion a unit help????
I need great advise, my boyfriend went for his trade test but failed the test of commissioning a unit and must write it over, I feel bad for him because he was so confident he would pass but failed because the temperatures he took on the unit or compressor or evaporator were wrong and the sum on the test paper involving the temperatures to calculate the units correct superheat was wrong. The whole sum was wrong. So he got a big wake up call. Please help guys. Please tell me how to correctly commission a unit and correctly calculate superheat of the unit. PLEASE
Last edited by chillin out; 06-06-2008 at 09:06 PM.
Similar Threads
-
MICROPROCESSOR DIAGNOSTICS/Differnces beteween TK/CTC
By REEFER-TEK in forum TransportReplies: 12Last Post: 27-03-2011, 04:12 AM -
SL/SB-400 Pump Down Procedures
By absolute-zero in forum TransportReplies: 1Last Post: 29-01-2008, 09:27 PM -
Thermo King OptiSet
By REEFER-TEK in forum TransportReplies: 4Last Post: 06-12-2007, 07:23 PM -
TK basic micro-p features and functions
By REEFER-TEK in forum TransportReplies: 0Last Post: 05-12-2007, 06:25 PM