Results 1 to 8 of 8
  1. #1
    Join Date
    May 2006
    Location
    Norwich
    Age
    53
    Posts
    134
    Rep Power
    18

    Whos ready for the F-Gas regulations ?



    What are you guys doing in readiness to the regulations, with regards to leak testing all system with 3.0 KG charge and over ?

    If there has been another thread covering this topic, can someone please provide me with the link.

    S-Line



  2. #2
    Join Date
    Aug 2001
    Location
    UK
    Posts
    1,046
    Rep Power
    24

    Re: Whos ready for the F-Gas regulations ?

    There are plenty of threads in the Legal-Marketing-Business forum, including links in them to the DTI and DEFRA web sites.

    As far as leakage checking is concerned, the European commission has to decide on the standard requirements for leak checks. This has to be done by July 4th this year, but don't be surprised if it slips.

  3. #3
    Join Date
    Aug 2001
    Location
    UK
    Posts
    1,046
    Rep Power
    24

    Re: Whos ready for the F-Gas regulations ?

    Quote Originally Posted by Argus View Post

    As far as leakage checking is concerned, the European commission has to decide on the standard requirements for leak checks. This has to be done by July 4th this year, but don't be surprised if it slips.
    What did I say about the commission letting the deadline slip?

    I've just noticed this link that appeared on ACRIB's site last night (June 28th).

    http://www.acrib.org.uk/MICD7023648

    .

  4. #4
    Join Date
    May 2006
    Location
    Norwich
    Age
    53
    Posts
    134
    Rep Power
    18

    Re: Whos ready for the F-Gas regulations ?

    Leak testing while carrying out service work will not be a problem.
    Just depends on what method of leak testing is required.

    TBH on a little 3KG system, a leak will make a massive difference on the operation of the system.
    With the symptoms of a low charge system be obvious to a trained engineer.

    I will expect to see service prices to go up, as there are many companies out there who send out a trainee to "Give the filters a shake" and call it a service :lol:

    Interesting times ahead, and for the better also.

  5. #5
    Brian_UK's Avatar
    Brian_UK is offline Moderator I am starting to push the Mods: of RE Site Moderator : and general nice guy
    Join Date
    Mar 2001
    Location
    Dorset
    Age
    76
    Posts
    11,025
    Rep Power
    60

    Re: Whos ready for the F-Gas regulations ?

    I have been doing a 'basic' over 3kg check for some time now.

    Nothing too elaborate, visually inspect any flare connections (assuming they are visible!), eyeball the pipework of the condenser, with a torch if needed.

    Any suspect joints then get a sniff from the electric nose and maybe a squirt of bubble solution.

    Doesn't really add too much time to the service period. You should be doing a visual check anyway and the covers are going to be off as well.
    Brian - Newton Abbot, Devon, UK
    Retired March 2015

  6. #6
    LRAC's Avatar
    LRAC is offline Veteran Poster I am starting to push the Mods: of RE
    Join Date
    Sep 2006
    Location
    Midlands
    Posts
    453
    Rep Power
    18

    Re: Whos ready for the F-Gas regulations ?

    Oh god i hope it helps our industry like the corgi system. With the luck were having at the moment i bet were the first to be inspected.

    Lrac
    Grumpy men live longer

  7. #7
    Join Date
    Oct 2004
    Location
    Scotland
    Age
    46
    Posts
    1,454
    Rep Power
    21

    Re: Whos ready for the F-Gas regulations ?

    I don't think engineers will be spending much time leak testing large systems. All they will do is install a leak detection system though out the store/factory.

    I personally think leak testing is a good thing, saves time and money in the long run, and also stops you getting a call at 3am.

    Chillin
    IF AT FIRST YOU DON`T SUCCEED.
    DESTROY ALL EVIDENCE THAT YOU TRIED!
    and go get a cuppa

  8. #8
    Join Date
    Aug 2003
    Location
    Netherlands
    Age
    49
    Posts
    620
    Rep Power
    21

    Re: Whos ready for the F-Gas regulations ?

    Quote Originally Posted by LRAC View Post
    Oh god i hope it helps our industry like the corgi system. With the luck were having at the moment i bet were the first to be inspected.

    Lrac
    Having a unlucky streak then?

    The posts I've seen from you recently are all a bit down!

    Employe's?

Similar Threads

  1. regulations on refrigerator cooling
    By obie in forum Training
    Replies: 6
    Last Post: 29-12-2006, 06:57 PM
  2. Building Regulations
    By Brian_UK in forum Chit Chat & Service Stories
    Replies: 1
    Last Post: 22-11-2006, 12:34 AM
  3. regulations
    By neil sailes in forum Refrigerants
    Replies: 9
    Last Post: 20-01-2005, 10:44 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •