question reference vrf installations
installing pipework for vrf systems if you are installing a vrf system am i correct in saying?
for example a 2 pipe system from the condensing with 2x bc boxs and 3x indoor units from each bc box is to be installed for this system.
a pipe seperator must be fitted into liquid line and another into the suction line and then branch of from them to the 2x induvidual bc boxes then from the bc boxes to the induvidual indoor units
a max pipe length of 70 metes to each inuvidual bc box from the outdoor unit then a max pipe length of 30 metres to each induvidual indoor unit from each bc box
just for an example.
i am trying to understand the installation process of the vrf systems am i correct in the pipe work set up or have i understood this in correctly.
Similar Threads
-
Heat Transfer Exam Question
By alexdouglas1969 in forum FundamentalsReplies: 10Last Post: 13-12-2008, 04:19 PM -
Newbie with a question
By AcidSlasher in forum FundamentalsReplies: 4Last Post: 07-03-2006, 11:20 AM -
quizy type question thingy
By rbartlett in forum Chit Chat & Service StoriesReplies: 25Last Post: 06-02-2006, 09:22 PM -
Urgent, Kirchoff question
By Peter_1 in forum FundamentalsReplies: 4Last Post: 20-01-2004, 03:12 PM