Results 1 to 6 of 6

Thread: Mycom 200sud-me

  1. #1
    Join Date
    Jan 2012
    Location
    SLOVENIA
    Posts
    9
    Rep Power
    0

    Mycom 200sud-me



    Hi there,

    I need documentation and spare part list for Mycom screw compressor, model 200SUD-ME.

    Thanks in advance for help.

    BR



  2. #2
    Join Date
    Dec 2007
    Location
    australia
    Posts
    3,356
    Rep Power
    39

    Re: Mycom 200sud-me

    Last edited by RANGER1; 04-07-2019 at 08:13 PM.

  3. #3
    Join Date
    Feb 2012
    Location
    libya
    Age
    41
    Posts
    94
    Rep Power
    13

    Re: Mycom 200sud-me

    can you send me preventive maintenance manual for 200VLD

  4. #4
    Join Date
    Dec 2007
    Location
    australia
    Posts
    3,356
    Rep Power
    39

    Re: Mycom 200sud-me

    Quote Originally Posted by mre212 View Post
    can you send me preventive maintenance manual for 200VLD
    Don’t know of preventative maintenance manual, only overhaul manual.
    Your email address was rejected at yahoo.
    What do you need exactly, what are you trying to do?

  5. #5
    Join Date
    Feb 2012
    Location
    libya
    Age
    41
    Posts
    94
    Rep Power
    13

    Re: Mycom 200sud-me

    thank you RANGER1 for your continuous support i hope this post finds you well
    please my MYCOM screw compressor 200VLD reach 50000 running hours and i would like to know the maintenance that i should apply in this time

    thank you

  6. #6
    Join Date
    Dec 2007
    Location
    australia
    Posts
    3,356
    Rep Power
    39

    Re: Mycom 200sud-me

    Quote Originally Posted by mre212 View Post
    thank you RANGER1 for your continuous support i hope this post finds you well
    please my MYCOM screw compressor 200VLD reach 50000 running hours and i would like to know the maintenance that i should apply in this time

    thank you
    http://www.mayekawamma.com/pdf/SCV_I...20tornillo.pdf
    mre212 in manual 5.6 to 5.9 is a fair indication of what needs to be replaced.
    Your machine may not have Variable Vi in which case a guide block & pin may need inspection.
    In general 50,000hrs would always replace following.

    Gasket & “0” ring kit
    shaft seal assembly
    thrust bearings
    locknut & washer kit
    main & side bearings
    balance piston & sleeve
    guide block & pin
    indicator “V” ring seal
    unload piston cap seal

    machine then good for another 30 t0 40,000 hours.

    Will find in’s a better document in next few days

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •