Results 1 to 2 of 2
Thread: Time required for cooling
Threaded View
-
14-04-2019, 09:04 AM #1
Time required for cooling
Hello,
For a typical bed room (lets assume 4m X 3m X 3m), lets assume it requires 1.5TR of refrigeration. When typical split units are considered, the desired temperature is attained in some 10-20 min during initial start up, and the compressor cycles at random intervals. Is there a method to determine this time required to cool down the air?
For example, if I propose 1TR unit instead of 1.5TR, I presume the unit will run for longer, but how longer?
Can some explain?
Thanks
Nevin.