    Operating Theatres



    Hi
    Does anyone no the requrements for operating theatres in regards to temperature , fresh air & filtration eg : hepa filters etc.
    It has been about 15 years since we installed A/C in an operating theatre.

    Thanks Nick



  2. #2
    Join Date
    Oct 2001
    Location
    Nottingham UK
    Posts
    5,668
    Rep Power
    51

    Re: Operating Theatres

    I've only done one for a local hospital and we just worked to the hospital spec, which was very rigid, i.e. Stainless steel air handling unit, hepa filters, pressure relief valves in the theatre walls (positive pressure in the room) etc.

    Can't say I've ever read any standard specs though, only the local hospital requirements.

  3. #3
    Join Date
    Aug 2005
    Location
    USA
    Posts
    5,302
    Rep Power
    25

    Re: Operating Theatres

    Is there an equivalent classification for this when compared to a cleanroom? There are some standards for these where you can reference the requirements.

  4. #4
    Join Date
    Aug 2005
    Location
    iraq
    Age
    67
    Posts
    130
    Rep Power
    19

    Re: Operating Theatres

    hi
    the air leaving the ahu must be sterelized by ultra-violet ray
    also it must be 100% fresh
    regards
    afeef

  5. #5
    Join Date
    Oct 2003
    Location
    Belgium
    Age
    62
    Posts
    5,630
    Rep Power
    34

    Re: Operating Theatres

    http://www.coolandcomfort.be/cc/nl/be/art/61/ in Dutch of course from an articel in the magazine I wrote

    I can translate perhaps the necessary items for you.
    It's better to keep your mouth shut and give the impression that you're stupid than to open it and remove all doubt.

  6. #6
    Join Date
    Jan 2006
    Location
    Croatia
    Age
    68
    Posts
    2,261
    Rep Power
    31

    Re: Operating Theatres

    Hi,

    Before 15-16 years I was on specialisation course for medical gases in UK (BOC-Ohmeda), learned a lot but working mostly in refrigeration forget almost all

    I have some documentation but it is too old and not useful today

    Here are some links:

    http://www.dgkh.de/cgi-local/byteser...gen_e_gelb.pdf

    http://www.apsf.org/resource_center/...psfmedair.html

    http://www.engr.psu.edu/AE/iec/abe/c.../isolation.asp

    Hope you can find some useful info,

    Best regards,

    Josip

    It's impossible to make anything foolproof because fools are so ingenious...

    Don't ever underestimate the power of stupid people when they are in large groups.

    Please, don't teach me how to be stupid....
    No job is as important as to jeopardize the safety of you or those that you work with.

  7. #7
    Join Date
    Mar 2006
    Location
    australia
    Posts
    14
    Rep Power
    0

    Re: Operating Theatres

    Thanks for your help guys but after hearing a bit more as to what happened during the site visit with my partner we are going to let them know to get a consultant involved as we'd have to increase our imdemnity insurance three fold.This is one for the consulting engineers who ahve all the info and insurance.
    Thanks heaps anway.

    Regards nick

Similar Threads

  1. Replies: 35
    Last Post: 13-12-2006, 11:51 AM
  2. operating envelope
    By protect in forum Technical Discussions
    Replies: 0
    Last Post: 23-06-2006, 03:03 PM
  3. Operating Engineer training
    By JSherrill in forum Training
    Replies: 1
    Last Post: 17-04-2002, 06:57 PM
  4. Outside Operating Temperature for a refrigerator
    By Kato in forum Technical Speculations
    Replies: 5
    Last Post: 10-11-2001, 12:55 PM
  5. basic operating principles of compressors
    By alanmongey in forum Fundamentals
    Replies: 2
    Last Post: 13-09-2001, 01:53 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •