Results 1 to 50 of 77
Thread: Propylene System
Threaded View
-
25-02-2008, 05:00 AM #18
Re: Propylene System
Aha
This project has been done now, it running well.
Not a DX control, it uses 8 flooded evaporators.
This system is consist of 4 compressors, 2 evaporative condensors, 2 liquid receivers, and 8 evaporators.
Results as following:
O ring is Viton.
Don't use drier-filter.
......
Thanks all.
This forum is great to me!
Similar Threads
-
Daikin fault codes
By Chris2005 in forum Air ConditioningReplies: 45Last Post: 21-03-2012, 10:09 PM -
System Burn Out Troubleshooting
By altaf22m in forum Technical DiscussionsReplies: 13Last Post: 07-05-2010, 09:24 AM -
Burn out System, Clean up procedure. & Troubleshooting.
By altaf22m in forum CommercialReplies: 19Last Post: 15-04-2008, 07:03 PM -
Refrigeration system proposal; comments please.
By DaBit in forum Technical SpeculationsReplies: 13Last Post: 01-01-2003, 03:42 PM -
Automotive A/C Vent Temp Range vs System
By Don Browney in forum Air ConditioningReplies: 1Last Post: 15-05-2002, 06:19 AM