So I just got back from Poland after commissioning the 110tons/24hr system on a factory trawler.

Almost done that is, filled the system and got it signed off by the class agency (Dnvgl), when the ship comes to Norway in three days we'll be running endurance tests and cleaning all the filters.

As some might remember I started the installation the first week of september, and was supposed to go back for an inspection after 3 weeks, this didn't happen because I gut stuck on a service job that kept me in Las Palmas for 5 weeks

So the first thing I did when I came on board was to have a pipe rebuilt. I'm attaching some pictures and 10 points to whoever spots which pipe I had to have rebuilt