    A curly load calculation

    Gents,

    I have a large storage room, 30m x 11m x 5.5m. 14 degree C room temp. Final weight of product when room fully loaded 600,000kg.

    However, here's the tricky bit. The product takes 7 days to be loaded into room and must have a slow pull down of 2 weeks and the room must be running when loading.

    So, first day 85,714kgs gets loaded, 2 week pulldown clock starts, second day next 85,714kgs gets loaded, 2 week pulldown clock starts, and so on till 7th day (when God rested, and my brain exploded) when room gets shut up for long term storage.

    How, do tell, does one calculate the load for this project?

    Strictly speaking, if we adhere to the supposed critical 2 week pull down requirement, it can't be done in one room...

    Regards Goober