Hey all.... while dealing with my other issues I noticed the way my system has been set up is as follows:
liquid receiver greater then 50% dump to IP pot until level reaches 45%
IP Pot greater then 55% dump to LP pot until 45%

now with my very limited ammonia experience this sounds very odd to me as there is no way the IP or LP pots can fill if they are in fact at a low level and require more liquid they must first wait until the pots upstream are satisfied.

if you had a constant load the correct amount of ammonia in the system this would be fine but in a production facility with rapid load changes this set up doesn't seem to work well...

so my question is : is this a standard way of doing things? how do you guys have your plant set up?
or simply did some one get it ass about?