    How much cooling load (TR) is required to cool 3000 Ltr of milk from 30 deg C to 3 deg C in 8 hrs?
    We want to use SS jacketed tank with DX cooling coil.



  2. #2
    Join Date
    Aug 2006
    Location
    england
    Age
    43
    Posts
    3,790
    Rep Power
    38

    Re: Milk processing

    8 hours is too slow if you are filling the tank in one go, the milk will spoil.

    How are you going to use the tank? (On a farm with two or three milkings a day, in a factory etc with one filling, at a depot with farmers bringing milk in small quantities over the day)

    Think they duty is about 3.1 tons but i would not have too much faith in that figure as i just used info found via google etc.
    Mostly found in Oxfordshire, UK :)

  3. #3
    Join Date
    Sep 2003
    Location
    ISRAEL
    Age
    65
    Posts
    4,109
    Rep Power
    37

    Re: Milk processing

    try here
    www.mgt.co.il

  4. #4
    Join Date
    Jan 2007
    Location
    India
    Posts
    60
    Rep Power
    12

    Re: Milk processing

    It is coming around 3.35 TR . However 8Hrs pull down is too much. I have seen 5 hrs as a pull down time followed in Dairy plants