I am currently in the process of building a hot and cold humidity chamber Type -1
Test space : 100 litres
450 mm x 450 mm x450 mm
-70 to +100


The average rate of heating and cooloing required is 2.5k per minute.
Can some one explain how do i figure that out in terms of temperature/min?