Results 1 to 3 of 3
  1. #1
    Join Date
    Nov 2012
    Location
    Australia
    Posts
    6
    Rep Power
    0

    Thumbs up cashys! how much should i charge



    hey lads, just did a quote for my first cashy. installing a 7kw in a centre wall through double brick, and have to run pipes,cable and drain through a wardrobe cavity. I told her 500-600 dollars, (jobs a bit of a **** fight). how much would you guys charge for similar jobs?(sparky is doing power).

    And how much for a simple back to back with no cables, 350?

    cheers.



  2. #2
    Join Date
    Aug 2007
    Location
    Sydney
    Age
    52
    Posts
    1,083
    Rep Power
    23

    Re: cashys! how much should i charge

    Hi Haz and welcome to the forum.
    I don't do cash jobs as a rule but the few times I have this is how I worked it out. How much would my company pay me for doing the work at overtime rates? Like double time. Work out how many hours the job would normally take then multiply.

  3. #3
    Dominator's Avatar
    Dominator Guest

    Re: cashys! how much should i charge

    I do minimum 500 for cashie. 300 for me 200 for my boss for materials. Then I go from there. I reckon your pretty spot on with your price.

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •