thanks viking,yesterday was meeting with consultant.showd me the selection of cooling tower.as per the selection chart the each cooling tower capacity is 562 ton.formula is 450*1.25.eventhough chiller is tripping when both towers are working.inspection is going on.

thanks
moideen-dubai