Results 1 to 19 of 19
Threaded View
-
29-12-2011, 05:44 AM #1
Recirculation recivers are 10m higher than fan coolers
Hi ,
I have a system which require machine room higher than the cold stores. A pump recirculation system is required. I believe it will be a problem to pump the liquid back to receiver since the vertical piping is 10 m long. And if hot gas defrost system is applied, i can't imaging what will happen. Does anybody have experiences for that kind of application.
THANKS!!