Results 1 to 7 of 7
Thread: Pu24ek
Threaded View
-
28-12-2011, 09:42 PM #1
Pu24ek
Im working on a 2 ton Mits P series R-22 its around 8 years old. I am getting a P6 code.
Unit is cycling of frost prevention. I was wondering gernerally speaking what the pressure is on the condensate or two phase line should be trying to determine if I have a restriction in the evap or the condenser.
Thanks in advance.