Results 1 to 10 of 10
Thread: As soon as possible??????
Threaded View
-
10-05-2011, 08:51 AM #1
As soon as possible??????
.
How would you difine as soon as possible?
According to DEFRA leak testing should be:-
Using all measures which are technically feasible and do not entail disproportionate cost operatorsleakage.
must: (a) prevent leakage of F gas refrigerants and (b) as soon as possible repair any detected
I have also read that regarding HCFC's 14 days is the maximum time before a repair can
be completed. According to DEFRA....
So
How would you difine as soon as possible?
taz
.