    R-12 R-23 Cascade System



    Hi Everyone,

    I m a final Year B.E student n m working on a Cascade System project to achieve -70 to -80 deg C.
    But i have some constraints regarding its cost(not to exceed beyond 30000 INR i.e abt 650 $).The system need not be too large as its just used for practical purpose.
    I have learned that abt 1/2 hp compressors for both LT n HT stages would be applicable.
    I wanna ask that can i have a 2 stage cascade with even lesser compressor size.
    Plz avoid using extreme technical terms as i am a novice in the field of Refrigeration.

    Here is a sample of the stages that i have been working on.what changes need to be made to reduce compressor work.
    Any help appreciated.



  2. #2
    waqar's Avatar
    waqar Guest

    Re: R-12 R-23 Cascade System

    Hey Guys
    Have been working on the design for past two days n thus far have been able to change the design as in the below images.Do u guys reckon dat a model as per the below design can be made up .Also i want to ask abt the cooling capacity n steps to increase it.




    Any help Appreciated.