Results 1 to 1 of 1
Thread: Mothballing the system
-
30-04-2010, 07:30 PM #1
Mothballing the system
What is the procedure for mothballing the primary refrigeration system with screw compressors and R-507. The system contains two screw compressors with horizontal oil separators, tube-and-shell water cooled condenser, economizer, oil cooling system and a cooling tower. Details of the procedure would be greatly appreciated here.
Is there any book or a standard procedure in English?
Thanks
Similar Threads
-
Daikin fault codes
By Chris2005 in forum Air ConditioningReplies: 45Last Post: 21-03-2012, 10:09 PM -
Ammonia Heat Pumps
By US Iceman in forum New TechnologiesReplies: 39Last Post: 22-03-2010, 06:36 PM -
Enthalpy Increasing Buffer System
By Reflexive in forum Technical SpeculationsReplies: 3Last Post: 23-12-2008, 03:18 PM -
Fan model for system optimization
By autt in forum System OptimizationReplies: 8Last Post: 31-03-2007, 05:34 AM -
Automotive A/C Vent Temp Range vs System
By Don Browney in forum Air ConditioningReplies: 1Last Post: 15-05-2002, 06:19 AM