Hi,

Im currently installing some large DX comms room units.

I have a riser lift of about 8m to 10m, and have been specified to install p traps and oil traps for the remote condenser pipe work.

Can any one specify the correct way of performing this, as several ways have been brought to my attention.

Basically i have a 8 to 10m riser and i would like to know whether i put traps on both discharge and liquid? p traps at the bottom and oil traps half way up??

people are confusing me on the correct way?????


would appreciate some ones advice??


thank you