Results 1 to 50 of 53

Thread: 4-stage cascade

Threaded View

  1. #1
    Join Date
    Jun 2007
    Location
    France
    Age
    45
    Posts
    88
    Rep Power
    17

    4-stage cascade

    Finally, I've decided not to go for an autocascade but a 4-stager unit.

    I've already prepared drawnings with expected size for pipes, item locations, etc.

    Here's the check list. I'm now waiting for the needed parts.




    Steps

    1. Empirical agencement of parts following drawing expectations
    2. Inter-parts piping
    3. Case building (as expected or revised thanks to step 1)
    4. Paintings (both case and compressors)
    5. Modding TXVs (one for R1150 and one for R14)
    6. Installation of parts into the case + brazing of prepared pipes
    7. Empirical realization of a bench station on top of the case + evaporators piping
    8. Finishing insulation
    9. Vaccuming all stages + filling them with R290
    10. Vaccuming again
    11. Charging and testing
    Last edited by before; 05-06-2009 at 03:51 PM.

Similar Threads

  1. r-23 low stage, cascade system
    By johnny1 in forum Refrigerants
    Replies: 8
    Last Post: 21-11-2009, 09:01 PM
  2. Building a 3 stage cascade
    By NoL in forum CPU Overclockers
    Replies: 9
    Last Post: 27-03-2009, 08:42 PM
  3. 3-stage cascade
    By before in forum CPU Overclockers
    Replies: 47
    Last Post: 22-02-2009, 11:18 AM
  4. Single stage Vs 2 stage comp rack
    By Kevin Yeo in forum Supermarket Refrigeration
    Replies: 0
    Last Post: 01-02-2007, 03:05 PM
  5. Regulation regarding hydrocarbons in an cascade
    By DaBit in forum Fundamentals
    Replies: 4
    Last Post: 19-01-2004, 12:42 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •