    Hello all, when you have built a new system from scratch, i.e. brand new cold room/refrigeration system, and fitting / brazing new pipework etc, would you have to carry out a triple evacuation??

    Thanks in advance



  2. #2
    Join Date
    Sep 2007
    Location
    Split Croatia
    Age
    57
    Posts
    6,151
    Blog Entries
    6
    Rep Power
    36

    Re: new cold room new refrig system!

    Triple evacuation could speed drying of system. If you are not satisfied with speed of your evacuation or you have lot of moisture in system, then triple evacuation is beneficial.
    That all depend on actual situation.

  3. #3
    Brian_UK's Avatar
    Brian_UK is offline Moderator I am starting to push the Mods: of RE Site Moderator : and general nice guy
    Join Date
    Mar 2001
    Location
    Dorset
    Age
    76
    Posts
    11,025
    Rep Power
    60

    Re: new cold room new refrig system!

    Not my normal work load but I would suggest that it is a good practice as coldroom downtime due to a poor install can be costly in both time and money.
    Brian - Newton Abbot, Devon, UK
    Retired March 2015

  4. #4
    Join Date
    Jul 2005
    Location
    luton
    Age
    42
    Posts
    87
    Rep Power
    19

    Re: new cold room new refrig system!

    i do a good few installs on coldrooms never do a triple vac just a good strength test and good vac(400-500 micron) unless i did not install pipework but might not be a bad practice.but never had a coldroom go down(touch wood) due to vac procedure
    Last edited by sean1; 25-06-2009 at 12:59 AM.

  5. #5
    Join Date
    Feb 2008
    Location
    adelaide sth.oz
    Posts
    1,015
    Rep Power
    19

    Re: new cold room new refrig system!

    triple evacuations went out the door when gas management legislations where introduced here.most triple evacuations where related to domestic applications in my day.
    mmm to beer or not to beer...........lets drink breakfast

  6. #6
    Join Date
    Nov 2003
    Location
    NSW, Australia
    Age
    40
    Posts
    242
    Rep Power
    21

    Re: new cold room new refrig system!

    i normally check all my joints as i go as you do... pressurize system with nitrogen when complete check for pressure drop/leaks before evacuating system charging and commissioning.
    "Old fridgies never die, they just run out of gas!"

Similar Threads

  1. System Burn Out Troubleshooting
    By altaf22m in forum Technical Discussions
    Replies: 13
    Last Post: 07-05-2010, 09:24 AM
  2. Cold Room Design - minus 25deg C
    By vijay_study in forum Fundamentals
    Replies: 34
    Last Post: 11-11-2009, 07:12 AM
  3. Replies: 19
    Last Post: 15-04-2008, 07:03 PM
  4. Calculating Refrigeration load for Cold room
    By Sridhar1312 in forum CO2
    Replies: 1
    Last Post: 16-01-2008, 12:06 AM
  5. Cold room box required
    By Andy W in forum Commercial
    Replies: 2
    Last Post: 19-07-2006, 08:48 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •