How much cooling load (TR) is required to cool 3000 Ltr of milk from 30 deg C to 3 deg C in 8 hrs?
We want to use SS jacketed tank with DX cooling coil.
Printable View
How much cooling load (TR) is required to cool 3000 Ltr of milk from 30 deg C to 3 deg C in 8 hrs?
We want to use SS jacketed tank with DX cooling coil.
8 hours is too slow if you are filling the tank in one go, the milk will spoil.
How are you going to use the tank? (On a farm with two or three milkings a day, in a factory etc with one filling, at a depot with farmers bringing milk in small quantities over the day)
Think they duty is about 3.1 tons but i would not have too much faith in that figure as i just used info found via google etc.
try here
www.mgt.co.il
It is coming around 3.35 TR . However 8Hrs pull down is too much. I have seen 5 hrs as a pull down time followed in Dairy plants