Originally Posted by
Grizzly
We always favour on the outlet.
You tend to get a faster response to a blocked Shell and tube on the outlet.
Besides which say the Shell and tube develops a leak.
If fitted to the inlet the flow switch would remain made, whereas on the outlet it would fail.
The flow switch is there to co confirm sufficient flow through the "Heat exchanger". Therefore you can only truly guarantee that if it is fitted to the outlet side.
Generally you can get away with either side, but on the outlet covers more failure scenario's.
Grizzly