Hi all, need to know the recommended additional gas required per metre of piping over pre charged length. For example, Daikin say 20g/m for everything over 'x' metres. So what is Toshibas rule of thumb?
Printable View
Hi all, need to know the recommended additional gas required per metre of piping over pre charged length. For example, Daikin say 20g/m for everything over 'x' metres. So what is Toshibas rule of thumb?
All depends what size liquid line is , that's what daikin go on , don't know how tosh do it , possibly the same !!
0870 843 0333 toshiba tech line , they may help
Liquid line is 1/4 if I remember! :)
I think 20g/metre for a 1/4 liquid line sounds right
Prob best to bell tech , let them know the model and liquid line size and length of run they will give you correct charge
Well, this might come as a shock but...
If you click HERE you will find that all the information you need about the Toshiba range is at your fingertips. All the specs, all the install and maintenance manuals, well even the O&Ms... If you get really stuck there is even a link to contact them...