gruntzilla
17-03-2013, 07:20 AM
I have a double twin compressor set up giving me trouble...this set up does not have a low ambient kit on it. The part that will make you chukkle is that this set up is in mn.
Well if you want to help me with low discharge superheats and an or an economically feasable alternative to screws let me know.
This chiller set up is for a plating. Process. It spends 90 percent of time u.der 30% maintaining 19 deg on 134. There is only a 900 gallon glycol tank.
I feel system should be at least 10,000 gallon silo for this set up as when they start plating on syzstem it instantly throws 1850 watts at system and can not ramp up fast enough to handle the shock. I feel we need a large buffer vessel...our engineer disagrees.
HATE INTRODUCING MYSELF THIS WAY...BUT HELLO FROM MINNESOTA EVERYONE WITH MEASURED AMBIENT OF 24 DEGREES
BRAD
Well if you want to help me with low discharge superheats and an or an economically feasable alternative to screws let me know.
This chiller set up is for a plating. Process. It spends 90 percent of time u.der 30% maintaining 19 deg on 134. There is only a 900 gallon glycol tank.
I feel system should be at least 10,000 gallon silo for this set up as when they start plating on syzstem it instantly throws 1850 watts at system and can not ramp up fast enough to handle the shock. I feel we need a large buffer vessel...our engineer disagrees.
HATE INTRODUCING MYSELF THIS WAY...BUT HELLO FROM MINNESOTA EVERYONE WITH MEASURED AMBIENT OF 24 DEGREES
BRAD