PDA

View Full Version : cashys! how much should i charge



Haz
06-01-2013, 07:06 AM
hey lads, just did a quote for my first cashy. installing a 7kw in a centre wall through double brick, and have to run pipes,cable and drain through a wardrobe cavity. I told her 500-600 dollars, (jobs a bit of a **** fight). how much would you guys charge for similar jobs?(sparky is doing power).

And how much for a simple back to back with no cables, 350?

cheers.

Tesla
06-01-2013, 10:22 AM
Hi Haz and welcome to the forum.
I don't do cash jobs as a rule but the few times I have this is how I worked it out. How much would my company pay me for doing the work at overtime rates? Like double time. Work out how many hours the job would normally take then multiply.

Dominator
19-01-2013, 12:04 PM
I do minimum 500 for cashie. 300 for me 200 for my boss for materials. Then I go from there. I reckon your pretty spot on with your price.