PDA

View Full Version : Rheem gas-pac air path designs, old vs, new insights?



pwned
20-09-2010, 07:27 AM
Old design: 1989 RRGG:


-return-->(blower)-->clamshell gas heat exchanger-->evaporator--> supply

New design: 2008 ish RRNL:

--return-->evaporator-->(blower)-->tubular heat exchanger--> supply


So, the old design had everything on push side and evaporator was placed after the heat exchanger.


New design pulls through evaporator, then pushes through through heat exchanger.

What are the pros and cons of the two designs?


The new design seems to be built a lot sturdier, by the way.

Brian_UK
20-09-2010, 11:11 PM
With the new design it allows for dehumidification with reheat.

pwned
27-09-2010, 08:27 PM
It also makes the heat exchanger cold and precipitate water soon after A/C turns off.