Hi, Every one...........
I'm just asking about the steps of designing the staircase pressurisation fan ( High rise building)
and which the most mode or phase is used during design.... Fire detection phase, Fire Fighting phase and Evacuation phase....
Because i'm confused ( I'm site engineer not designer ) but i have to select the suitable fan according to cfm and static pressure.....