23-12-2009, 08:53 PM
Sir,
I have to install a blast freezer with the following specification:
Height: 6 Feet
Width: 10 Feet
Length: 22 Feet
2 compressors use 15 Hp each
2 cooling coils used with 4 fans each
Gas use R22
Product : Chicken
Both cooling coils hang on staring end of the blast freeze (Length)
Sir, Kindly suggest me that how much time it take to reduce the teperature of the chicken from +15C to -20C.
Or is it possible that it reduce teperature of chicken from +15 C to -20C in 4 to 6 hours and how.
Thanking you
Muhammad Kashif Ilyas
mkashifilyas@hotmail.com
I have to install a blast freezer with the following specification:
Height: 6 Feet
Width: 10 Feet
Length: 22 Feet
2 compressors use 15 Hp each
2 cooling coils used with 4 fans each
Gas use R22
Product : Chicken
Both cooling coils hang on staring end of the blast freeze (Length)
Sir, Kindly suggest me that how much time it take to reduce the teperature of the chicken from +15C to -20C.
Or is it possible that it reduce teperature of chicken from +15 C to -20C in 4 to 6 hours and how.
Thanking you
Muhammad Kashif Ilyas
mkashifilyas@hotmail.com