SkyWalker
19-07-2009, 10:29 AM
hi guys, quick question, when commissioning a DX system (TEV) with evap in air handling unit, what load isit best to use?
ie, the air handler can either blow full fresh air over the coil or it can exchange some heat with the internal air?
on a summers day it may be 28'C ambiant external which would be alot of load on the evap, isit best to start with full fresh air when commissioning to allow for worst case load situations.
ie, the air handler can either blow full fresh air over the coil or it can exchange some heat with the internal air?
on a summers day it may be 28'C ambiant external which would be alot of load on the evap, isit best to start with full fresh air when commissioning to allow for worst case load situations.