Les Martin
28-02-2009, 08:27 AM
On the Daikin VRV 111 is there a way to close off the bs box refrigerant in order to work on the downstream refnuts.
We have made a basic error of connecting one refnut to form basically a dead end in the pipinrg and only discovered this after charging and starting up the system.
Regards
Les Martin:confused:
We have made a basic error of connecting one refnut to form basically a dead end in the pipinrg and only discovered this after charging and starting up the system.
Regards
Les Martin:confused: